Running and monitoring

Submitting a simulation creates a managed job associated with the active project, mesh and simulation configuration.

Job stages

A run typically moves through validation, queueing, mesh preparation, accelerator start-up, solution, result finalisation and completion. Studio shows the current stage and retains logs if you leave the page.

What to monitor

  • Residuals indicate how the discrete equations are contracting.

  • Forces and moments show whether aerodynamic loads have stabilised.

  • Mass flow or pressure loss shows whether an internal-flow operating point is stable.

  • Temperature and heat rate show whether a thermal system has reached a meaningful state.

  • Runtime progress distinguishes an active solve from queueing, data preparation or result export.

Stop, retry or revise

Stop a run when the configuration is known to be wrong or the solution is moving toward a non-physical state. Retry infrastructure interruptions without changing the case. Revise the project configuration when geometry, mesh, physics or numerical evidence is the cause.

Do not hide a poor setup by only increasing the iteration budget. Fix missing boundaries, incorrect units, insufficient domain clearance, mesh defects or unresolved physics first.